Remediation Injection

To assist in the remediation of a contaminated site, Ecoprobe has the capability to inject a variety of remediation agents. Depending on the geology and client requirements we can inject at a rate of 5-20lts per minute per injection point. With the use of specialist injection pumps, multiple spears and flow meters up to 15000lts per day can be injected.

A permanent 50mm - 80mm injection well may be installed or alternatively a temporary spear may be used with injection taking place at various depths as the spear is withdrawn.